Friday, July 18, 2014
Cranes at the construction site prepare supports for new building

This week's activity on the contruction site included the arrival of another crane (on the right) to help the caisson driller ready the supports for the south end of the building. The caisson driller will drop sleeves into the drilled holes as part of the support system for the cantilevered section of the Jackman Law Building. In the foreground, you can see the rebar and the sections of sleeve that will be dropped into the hole.