Reading room under construction

Eastern project manager Dean Walker captured this 'picture-perfect' image of what will be the reading room in the renovated Bora Laskin Library. An incredible view and an abundance of natural light will greet law students in this area for quiet study.

 

New Moot court under construction

The new Moot Court is coming together. The top tiers will have floor heating to prevent large swings in temperature. 

 

Level two under construction

You're looking south at the connection point of the library entrance and the Jackman Law Building. This view contains what will be the new south entrance to the law school (enshrouded in tarps right now) and the Moot Court. The slab has been poured and is being protected from the elements by the insulated blankets.

 

Level three under construction

On the third level: here's the metal deck which forms the bottom of the slab and is being prepared for concrete placement.

 